2000BPH glass jar liquor filling machine
Liquor filling machine
1, Capacity: 2000BPH
2, Bottle type: glass jar
3, Cap type: metal cap
4, Machine type: 3 in 1 filling machine
Technical Specifications
| Model | CGF12-12-4 |
|---|---|
| Capacity | 2000BPH 500ml glass jar |
| Bottle washing position | 12 |
| Bottle filling position | 12 |
| Bottle capping position | 4 |
| Bottle washing consumption | 300-500kg/h |
| Water pressure of bottle washing | 0.18-0.25Mpa |
| Gas source pressure | 0.4Mpa |
| Filling pressure | 0.4Mpa |
| Filing precision | +5MM |
| Material | Stainless Steel SUS304 |
| Autoamtic control systerm | PLC touch screen |
| Gas consumption(m³/min) | 0.8 |
| Total power | 4kw |
| Weight | 3000kg |
| Size | 2430*1800*2250MM |
Description
Product Description:
The filling machine is designed to fill water, liquor, and another non-carbonated water into plastic bottles, glass jars.
The filling machine is customize basing on below conditions:
1, The production capacity per hour;
2, Bottle type: plastic bottle, glass bottle, can etc;
3, Cap type: plastic screw cap, aluminum cap, crown cap etc;
4, Filling liquid: water, juice, carbonated, wine, beer etc;
Advantages:
The filling machine is customize basing on below conditions:
1, The production capacity per hour;
2, Bottle type: plastic bottle, glass bottle, can etc;
3, Cap type: plastic screw cap, aluminum cap, crown cap etc;
4, Filling liquid: water, juice, carbonated, wine, beer etc;
Application:
2000BPH glass jar liquor filling machine is designed to fill water, liquor, and another non-carbonated water into plastic bottles, glass jars
Packaging & Delivery:
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
FAQ:
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.





